Wednesday, August 14, 2013

Monetization of Cash backed BG


If the BG is fully cash backed we can monetize in the following ways 1. Can discount and  pay any country you want2. Can advance loan3. If BG owner interested we can trade and pay him the  proceeds. The following are the procedures . 1. The BG has to be from TOP bank and cash backed.2. you need to provide  copy of the BG  along with Verification letter from the BG owner with full contact details(CIS  PREFERRED)3.On receipt we will verify the instrument and authenticate thro our banker.4.Once verified funding company will contact the owner of Bg and discuss his willing ness to RWA.5.Once the BG owner agreed over phone the contract will be issued6. After signing the contract bank to bank communication will be undertaken as regards assigning of BG and payment.7. Once point no.6 is completed then Bg owner will assign the BG via MT760  and payment is made to bg owner.8.  the service charges are 2% to be divided between both side 50/509. the price will range from 70 to 80%  While sending the BG copy please indicate what the Owner wants out of the above 3 options mentioned

Friday, August 2, 2013

saritha nair and solar

Team solar
We are a professional team from Kerala delivered more then 2000 solar unit all over Kerala and going to deliver more then 5000 solar unit by next 1 year. We have very dedicated team managing by Mrs. Saritha Nair and Mr. Biju Radakrishan is chair man who have more then 10 years experience in solar systems.

Companies who stand to lose http://cdn.wikinvest.com/i/px.gif
Applied Materials, the much beleaguered and recently resurgent semiconductor company, might fear the inevitable price increases in silicon, let alone supply shortages in wafers, that can result from continued rapid growth in solar. As the second-place player in semiconductors, the company is more likely than Intel to face pressure from its suppliers. It should be noted, however, that the company has made a bold move into solar, shifting massive amounts of production into making solar cells-- thus a competitive threat becomes a business opportunity.


Ironically, the economies of scale inherent in solar suggest that first-movers can be penalized for taking the leap into solar too soon, locking them into electricity costs that are higher than their competitors, who are buying next generation technology (think of the U.S. mobile phone market, which was to some extent hampered by getting to mobile phones too soon and locking in to the wrong technologies, thereby surrendering technical superiority to other markets such as Japan, South Korea, and the EU). Watch out for the first major corporation to announce 10% of energy to be procured from solar sources-- this might be a good company to watch for negative exposure to the rise of solar.

Sunny side up

Solar energy business looks up in India as tariffs fall
In October last year, Moser Baer Clean Energy commissioned a 30 megawatt (MW) photovoltaic (PV) farm at Banaskantha district in north Gujarat.  The plant will supply an estimated 52 million units of energy in a year - roughly the amount that Kerala consumes in a day.  
Earlier this month, the Adani Group announced that it had commissioned a 40-MW solar power project , touted as the country's largest, in Gujarat's Kutch district.  For Adani, India's largest private thermal power producer, it is the first major project in the renewable energy space.

But it is Solairedirect that has really set the new benchmark. The French company's bid of Rs 7.49 per kilowatt-hour (kWh), equivalent to 15 US cents, for its proposed 5 MW plant in Pokhran, Rajasthan, is by far the lowest tariff quoted under India's ambitious Solar Mission. In comparison, the price per kWh is about 23 US cents in Germany, the world's biggest solar power user.


Each project underlines the importance that is now being given to solar energy in India. The country, sun drenched for more than 300 days a year, is ideally suited to use it.  But while the potential is well known, India has remained far behind Europe and the US, both in manufacturing and project capacities.

Now, the central and state governments are slowly working to harness the power of the sun. In January 2010, the Centre launched the Jawaharlal Nehru National Solar Mission, which targets setting up a generation capacity of 20,000 MW by 2022.
In addition, 21 states are pursuing their own program, which optimists reckon will add another 10,000 MW over the next 10 years. Thus far, Gujarat and Rajasthan, blessed with the largest incidence of solar radiation, have attracted the largest inflows of investment. 




US lobbies hard for access to India's solar component market

Just three years ago, grid-connected solar power in the country was less than 12 MW.  By the end of 2011, India had acquired 190 MW in solar power generation capacity.  By March 2013, that figure will grow five-fold to 1,000 MW under the Solar Mission targets alone.

Investor interest is rapidly growing.  "There is an increased awareness about the opportunities in India among investors globally because of the decline in Europe, and China being a closed market," says Thomas Muslin, a Washington DC-based analyst with global consulting firm IHS Emerging Energy Research.
According to a report by Marcum Capital, a clean energy consulting firm, India received $95 million (Rs 500 Cr) in venture capital funding and over $1.1 billion in large-scale funding for solar projects in 2011. The biggest funding deal was the $694 million loan raised by Maharashtra State Power Generation Co. for its 150 MW Dhule and 125 MW Sakri projects. Export-Import Bank of the United States was the biggest investor, funding seven different large-scale projects.

Sunrise Industry

The reach for the sun is being driven by a host of private sector players. Green Infra, founded by Raja Parthasarathy, Managing Director of IDFC Private Equity, entered the solar space about 13 months ago. In November, its 10 MW solar farm in Gujarat's Rajkot district began pumping electricity into the state's grid. By the year-end, Green Infra had also bagged orders to set up two plants in Rajasthan Jodhpur district. "In 2013, we will be looking at concentrated solar power projects with capacities in excess of 50 MW," says Shivanand Nimbargi, Managing Director and CEO of Green Infra.

Solar snapshot

Solar power is clean, renewable and needs only sunlight. However, it has a high initial cost, can only generate electricity during daylight hours and loses effi ciency in cloudy weather. The price per unit is also higher than that of conventional electricity.

Solar PV Power: Photovoltaic (PV) power generation relies on solar panels, which are made up of PV cells that convert light into electricity. The panels are made of crystalline silicon. Today, thin fi lm PV cells are emerging as a cost-effective alternative to silicon-based panels.

Solar Thermal: This technology involves using solar radiation to boil water and run turbines with the resulting steam.

Concentrated Solar Power: CSP systems use lenses or mirrors and tracking systems to trap solar energy. The energy is then used as a heat source for a conventional power plant.

Tariffs: In 2010, the average tariff (PV power plants) under India's Solar.

Mission was Rs 12.25. It has been declining steadily and is now at Rs 8.77 a unit. 
Azure Power, started by first-generation entrepreneur Inderpreet Wadhwa, currently owns solar parks with 17 MW capacity. Wadhwa says the company has already invested $100 million and will invest more as projects arise. The big guns have also begun to jump onboard the solar bandwagon. Mukesh Ambani-owned Reliance Industries and Madhusudhan Rao-led Lanco are running capacities of 6 MW each; Lanco is working on projects that will raise its capacity to 100 MW. Last October, Venugopal Dhoot's Videocon commissioned a 5 MW farm in Maharashtra.
Our Gunthawada and Sivaganga farms are generating electricity at 15 per cent more than designed levels: Ratul Puri
The slowdown in the US and European markets has worked to the advantage of companies operating here. Overcapacity with module makers has led to a phenomenal crash in the prices of solar modules. In addition, panel efficiency has been rising gradually, promising more bang for the buck. "Both our Gunthawada and Sivaganga farms are generating 15 per cent more than designed levels," says Ratul Puri, Chairman of Moser Baer Projects.

The growing confidence of the developer community is also helping. Two years ago, the government was ready to buy solar power at Rs 18 a kWh or unit of power. Scenting investor interest, NTPC Vidyut Vyapar Nigam, which oversees the solar mission, has since adopted the 'reverse auction method' to award projects, signing on developers quoting the lowest tariffs. This has led to huge savings - one analyst estimates it at Rs 1 crore per hour over last year's tariffs.

In 2010, the average tariff reached during Round One of the PV bids was Rs 12.25; in Round Two, it dropped to Rs 8.77 a unit. "The tariffs quoted are among the lowest in the world,'' says Tarun Kapoor, Joint Secretary (Solar), Ministry of New and Renewable Energy.
NTPC Vidyut Vyapar CEO Anil Kumar Agrawal believes prices of solar power will be comparable with those of grid or pool power by 2015/16. "Going by what equipment manufacturers are saying, grid parity is likely at between Rs 5.50 to Rs 6 a kWh levels," he says.

According to Priteesh Mahajan, Senior Vice President, ABB India, the real explosion will be in domestic and on-grid rooftop solar panels. "In Australia or Germany, all 
houses are covered. In India you can generate more power than these countries,'' he says. The multinational makes all the equipment needed to put up solar farms, except modules.


"Going by trends, a developer can hope to make profits eight years after commissioning of a project," says S. Ramesh, Chief Engineer, RenewableEnergy, Karnataka Power Corporation. "After eight years, the entire revenue minus running costs becomes the profit, because there is no fuel cost involved." Maslin of IHS Research, however, thinks the real challenge before developers who have quoted low tariffs will be to squeeze profits, as the cost of funds is very high. While solar feed-in tariffs are falling, some lenders feel developers are bidding a bit too aggressively. There have been reports of banks cold-shouldering firms even after the latter produced bankable power purchase agreements signed with government agencies.

On its part, the government is trying to address some of these concerns. "We are organising field visits for bankers so that they know what is happening on the ground,'' says Joint Secretary Kapoor.

NTPC Vidyut Vyapar CEO Agrawal thinks problems with lenders will be fewer after the recent auction. The government should strengthen the renewable energy certificate (REC) mechanism so that projects become bankable, says Green Infra's Nimbargi. State distribution utilities are required to have a certain portion of their input energy from renewable sources. Those falling short of this renewable purchase obligation (RPO) can make up the shortfall by buying RECs. Kapoor says the RPO requirement will be more than 30,000 MW in 2022.

It has been late coming, but the newfound affinity for solar power is welcome. In a few years from now, parts of India may well be using solar power for most of the day.

Gujarat to become India's largest solar power producer.



Gandhi agar, April 17: 
Commercially exploiting large tracts of wasteland, Gujarat is set to emerge as India's largest solar power destination. The Chief Minister, Mr Narendra Modi, will dedicate 600 MW of solar power projects to the nation on Thursday.
Currently, India's total solar power production is nearly 900 MW, two-thirds of which will be produced by Gujarat alone.
On Thursday, Mr Modi will launch India's first Solar Power Park with generation capacity of 500 MW in 3,000 acres Charanka village, Randhanpur taluka, in Patan district. Currently, it has an aggregated operational capacity of 214 MW of solar power projects commissioned at a single location. The Patan ceremony will be attended by representatives from Australia, Canada, China, Germany, Italy, Hong Kong, Singapore, the UK and the US.
The Gujarat Solar Park is an innovative concept of the State Government to promote solar installations in which it allocated developed land to the project developers with the entire infrastructure including power evacuation, roads and water for commissioning of the power project put on fast track.
Under its Solar Power Policy, the State Government had signed up memorandums of understanding for generation of 968.5 MW of solar power by December and also took an initiative to launch the Gujarat Solar Park with a vision to build it as the world's largest solar power park. Its foundation stone was laid in December 2010.
The dedication ceremony will be followed by the ‘India Solar Summit 2012: Investment and Technology Expo' to be hel